19    STREET OAKLAND BART STATION

TH

DATE OF COMPLETION

Dec. 2020

ELECTRICAL SCOPE

$3,000,000

GENERAL CONTRACTOR

Proven Management Inc.

Red Dipper has partnered with Cupertino Electric as the preferred electrical contractor for BART. Red Dipper is responsible for lighting, lighting branch conduit, supports, lighting homerun conduit, lighting branch cable, lighting fixture installation,  removal of existing lighting, disposal of existing lighting, general conditions, equipment, labor, and material as well as all logistics to perform the above scope of work.